Practical Consequences
- ◆Inspection stations can run at higher line speeds on the same hardware.
- ◆GPU capital expenditure and power draw fall for a given inspection volume.
- ◆Low-light inspection becomes viable without IR illumination, verified below 5 lux.
- ◆Additional stations can be added without a proportional inference budget increase.
Talk through your inspection workload.
Request a briefing →